PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Bolting Derrick -7 (3rd Floor) Facing North-West (800x600).jpg Bolting Derrick -8 (4th Floor) Facing North-West (800x600).jpg Installing and welding metal deckinga at Derrick -7 (2nd Floor) Facing North (800x600).jpg Bolting Derrick -8 (Roof) Facing South (800x600).jpg Installed rebar and constructed forms for the trench drains (800x600).jpg Welding Derrick -4 (4th Floor) Facing South(800x600).jpg
Previous pageNext page Installing and welding metal deckinga at Derrick -7 (2nd Floor) Facing North (800x600)
Installing and welding metal deckinga at Derrick -7 (2nd Floor) Facing North (800x600)